Taikang Financial Tower
There are 4 heat exchanger systems in the building, which have to be treated. For the business purpose, the hot water supply can not be interrupted. 4 sets of Vulcan S10 were installed to gently clean the heat exchangers and the whole piping system without stopping the machines.
Hongtai Paper Company
The condenser and the oil cooling system have problems such as scaling and biological slime. It needs to be cleaned once every 3 months. The normal scale inhibitor dosage is about 200 kg per month. Besides, algaecide needs to be added every year from April to October. The Vulcan descaler save this company 4,733 USD every year!
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058Email: Pierre@Waslix.com