NYC Accelerator lowering pollution carbon emission mineral scale
 

NYC made a commitment to reduce greenhouse gas emissions by 80% by 2050 — this projected level by the United Nations is needed to avoid the most dangerous effects of climate change

NYC logo arrows
 
 



hard water softening and descaling technology vulcan small
red video button

HOW can this technology help support NYC 2050 climate mandates?

pdf largeWaslix: Impulse Frequency Mineral Descaler Technology4.42 MB

Mineral scale deposits in building support equipment (cooling towers, heat exchange plates, boilers, water pipes, valves, and other equipment interacting with water) has been shown to increase energy consumption, water demands, lowered equipment and support component part lifecycles. U.S. Department of Energy Report (PNNL-22921) under Contract DE-AC05-76RL01830

Over 40 years of product development across 70 countries has allowed this sophisticated technology to effectively remove existing mineral scale build-up and prevent new hard water scale bonds from forming. Unlike water softening resins, media and other similar water softening processes this proprietary wobbling impulse frequencies tech accelerates a natural occurring phenomenon to dismantle and restructure mineral bonds without affecting water chemistry, as observed with other water softening process, while eliminating mineral scale.

Other than approx. 2 watts of electrical energy, no other consumables are used with this technology to prevent and loosen existing mineral scale; making this technology a truly eco-friendly inclusion tool to lower your building’s carbon footprint.
 



redevelopment

Please excuse our messy website!
We are developing a custom content management function to effectively communicate simple to high involvement products and solutions. Our new software should be ready to implement by April 30, 2024. Go exploring… 
Contact us at 412-848-5058 or info@waslix.com with any questions.


Mineral scale causes an increase in energy loss  Vulcan mineral descaler factory industrial NYC



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


W1 – Public Elementary, Junior or Senior High
W1 – Public Elementary, Junior or Senior High

Mineral Descaling Models:
6" Main Water Pipe: S150
(multiple locations)
4" Main Hot Water Pipe: S50
(multiple locations)
3½" Colling Towers: S50
4" Pool Pipes: S100
2" Irrigation Pipes: S10

Installation Considerations:
A holistic plan to descale the entire school to maximize energy efficiencies and extending the lifespan of pumps, equipment parts, and other water based equipment.
• Schools
• Energy Efficiency Studies
• Irrigation
W2 – Parochial School, Yeshiva
W2 – Parochial School, Yeshiva

Mineral Descaling Models:
4" Main Water Pipe: S100
4" Main Hot Water Pipe: S50
2" Cooling Operations: S10

Installation Considerations:
Additional mineral descaler installed in various parts of the school may be required, depending on total school square footage and equipment used.
• Schools
• Energy Efficiency Studies
• Return On Investment
W3 – School or Academy
W3 – School or Academy

Mineral Descaling Models:
6" Main Water Pipe: S150
(multiple locations)
2" Main Hot Water Pipe: S25
(multiple locations- support showering facilities)
4" Equipment Pipes: S25

Installation Considerations:
Additional mineral descalers could be required, depending on total school square footage and equipment used.
• Schools
• Return On Investment
• Irrigation



W4 – Training School
W4 – Training School

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Cooling Tower Pipes: S25

Installation Considerations:
Depending on the school’s total square footage, equipment used and ultimate goal; additional mineral descalers could be required.
• Schools
• Return On Investment
AW5 – City University
W5 – City University

Mineral Descaling Models:
Customized installation plan will be required

Installation Considerations:
If the University is interested in eliminating scale buildup in typical equipment (boilers, heat exchangers, cooling towers, pumps, etc) then sizing the appropriate model with be to match or exceed pipe diameter to descaler model  specifications. Contact us to develop an installation plan to descale the campus as part of the  University’s sustainability goals.
• Schools
• Return On Investment
W6 – Other College And University
W6 – Other College And University

Mineral Descaling Models:
Customized installation plan will be required

Installation Considerations:
If the University is interested in eliminating scale buildup in typical equipment (boilers, heat exchangers, cooling towers, pumps, etc) then sizing the appropriate model with be to match or exceed pipe diameter to descaler model  specifications. Contact us to develop an installation plan to descale the campus as part of the University’s sustainability goals.
• Schools
• Pool and Spa
• Irrigation



W7 – Theological Seminary
W7 – Theological Seminary

Mineral Descaling Models:
8" Main Water Pipe: S350
4" Main Hot Water Pipe: S50
2" Secondary Pipes: S10
(multiple locations)
2" Equipment Pipes: S10

Installation Considerations:
Contact us to develop a holistic installation plan to maximize energy efficiencies in mineral scale problem areas.
• Schools
• Pool and Spa
• Irrigation
W8 – Other Private School
W8 – Other Private School

Mineral Descaling Models:
8" Main Water Pipe: S350
4" Main Hot Water Pipe: S50
2" Secondary Pipes: S10
(multiple locations)
2" Equipment Pipes: S10

Installation Considerations:
Contact us to develop a holistic installation plan to maximize energy efficiencies in mineral scale problem areas.
• Schools
• Pool and Spa
• Irrigation
W9 – Miscellaneous Educational Facility
W9 – Miscellaneous Educational Facility

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Equipment Pipes: S10

Installation Considerations:
Remove mineral scale from vital building equipment before addressing a holistic plan to descale the entire building.
• Schools
• Pool and Spa
• Irrigation





Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Mineral scale causes an increase in energy loss  Vulcan mineral descaler factory industrial NYC



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


Q1 – Parks/ Recreation Facilty
Q1 – Parks/ Recreation Facility

Mineral Descaling Models:
2" Irrigation Pipes: S10
(multiple locations)

Installation Considerations:
The mineral descalers can be included in the park/ recreation facility’s irrigation system and fountains to prevent mineral scale blockages.
• Pool and Spa
• Sport Complex
Q2 – Playground
Q2 – Playground

Mineral Descaling Models:
None

Installation Considerations:
Not applicable unless there is a water feature that required descaling
• Pool and Spa
• Sport Complex
Q3 – Outdoor Pool
Q3 – Outdoor Pool

Mineral Descaling Models:
4"Pool Pipe: S150
(supply and return)

Installation Considerations:
An important consideration will be the rate the water pumps circulate the pool water more than the diameter of the pipes.  
• Pool and Spa
• Sport Complex



Q4 – Beach
Q4 – Beach

Mineral Descaling Models:
None

Installation Considerations:
Not applicable unless there is a water feature that required descaling
 
Q5 – Golf Course
Q5 – Golf Course

Mineral Descaling Models:
2" Irrigation Pipes: S10
(multiple locations)

Installation Considerations:
An entire irrigation system for a golf course can be supported to prevent sprinklers from becoming blocked with mineral scale.
• Gold Course
• Irrigation
Q6 – Stadium, Race Track, Baseball Field
Q6 – Stadium, Race Track, Baseball Field

Mineral Descaling Models:
8" Main Water Pipe: S250
(multiple locations)
4' Secondary Pipes: S50
(multiple locations)

Installation Considerations:
Contact us so we can map the stadium’s water piping network to develop a custom installation plan.
• Sport Complex
• Irrigation



Q7 – Tennis Court
Q7 – Tennis Court

Mineral Descaling Models:
None

Installation Considerations:
Not applicable
• Case Studies
• Case Studies
Q8 – Marina, Yacht Club
Q8 – Marina, Yacht Club

Mineral Descaling Models:
2" Main Water Pipe: S25
1" Water pump pipes for hose support: V5000

Installation Considerations:
Installing one mineral descaler for the marina building will be adequate
• Return On Investment
Q9 – Miscellaneous Outdoor Recreational Facility
Q9 – Miscellaneous Outdoor Recreational Facility

Mineral Descaling Models:
None

Installation Considerations:
Contact us for the facility’s specific need
 





Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


P1 – Concert Hall
P1 – Concert Hall

Mineral Descaling Models:
6" Main Water Pipe: S250
4" Cooling Operation Pipes: S50
2" Equipment Pipes: S10

Installation Considerations:
Using a significantly larger descaler on the main cold water pipe to dramatically improve the descaling benefits of nearby equipment while supporting continued descaling efforts in upper levels. It will not be necessary to use a descaler on the hot water pipe coming from the boiler because  the hot water supply is not used to support bathing facilities.
• Energy Efficiency Studies
• Sport Complex
P2 – Lodge Room
P2 – Lodge Room

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Support Equipment Pipe: S10

Installation Considerations:
A simple and direct installation plan to offer descaling improvements for each level of this building. Use additional descalers for semi-closed loop cooling tower / evaporative cooler operations.
• Energy Efficiency Studies
• Apartment Buildings
P3 – YWCA, YMCA, YWHA, YMHA, PAL
P3 – YWCA, YMCA, YWHA, YMHA, PAL

Mineral Descaling Models:
6" Main Water Pipe: S250
6" Main Hot Water Pipe: S150
4" Cooling / Support Equipment: S50
2" Pool: S50
(supply and return)

Installation Considerations:
Using multiple descalers in various parts of this type of community building where water demands are higher is a better descaling and energy saving plan than relying on 1-3 significantly larger models to accomplish the same goal.
• Return On Investment
• Fitness Centers



P4 – Beach Club
P4 – Beach Club

Mineral Descaling Models:
4" Main Water Pipe: S100
4" Main Hot Water Pipe: S100
4" Pool Pipes: S100
2" Spa Pipes: S25
2" Equipment / Cooling: S25

Installation Considerations:
This installation plan is to maximize the descaling effect to dramatically improve energy savings in the shortest period, extend descaling impacts in showering facilities, and extend pool and spa filter lifespans.
• Return On Investment
• Pool and Spa
P5 – Community Center
P5 – Community Center

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Hot Water Pipes: S10
(main pipe for each showering facility)
3½" Cooling / Equipment Pipes: S50
(supply and return)

Installation Considerations:
If it is possible to access the hot water pipes near showing facilities, smaller mineral descalers can be installed to help keep these areas cleaner with less chemical used to achieve the same result. 
• Return On Investment
• Energy Efficiency Studies
• Sport Complex
A0 Cape Cod
P6 – Amusement Place, Bath House, Boat House

Mineral Descaling Models:
Installation plan will vary greatly between in this building classification.

Installation Considerations:
Amusement Place: 2” Main Water Pipe: V5000- positioned in multiple locations

Boat House: ¾” Pipe: V3000

Bath House: Water demands are extensive- spas, showering, hot pools, etc. Contact  us so we can learn more about how your facility uses water, water filtration equipment, GPM water flows, etc.
• Residential Studies
• Pool and Spa



A0 Cape Cod
P7 – Museum

Mineral Descaling Models:
6" Main Water Pipe: S250
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
4" Building Equipment: S100
(multiple locations)

Installation Considerations:
Typically, museums occupy a large square footage. Although their water demands are not as intensive as high-rise apartments, cooling and other support equipment will need to be given close attention.
• Energy Efficiency Studies
• Return On Investment
• Cooling Towers
A0 Cape Cod
P8 – Library

Mineral Descaling Models:
4" Main Water Pipe: S100
(2-3 possible locations)
2" Cooling/ Equipment: S25

Installation Considerations:
Supporting the library cooling operation system and other equipment would be the primary focus. Descaling general piping network would involve using 1-3 descaling units; depending on total square foot and stories.
• Energy Efficiency Studies
• Return On Investment
• Cooling Towers
A0 Cape Cod
P9 – Miscellaneous Indoor Public Assembly

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Secondary Pipes: S100
(1 descler per level)
4" Main Hot Water Pipe: S100
4" Heating Exchanger: S50
4" Cooling Tower: S50

Installation Considerations:
Contact us so we may track your building’s water pipe  network and supported equipment for the best installation strategy.
• Energy Efficiency Studies
• Return On Investment
• Cooling Towers





Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Mineral scale causes an increase in energy loss  Vulcan mineral descaler removed and prevents mineral scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


N1 – Asylum<
N1 – Asylum

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Main Hot Water Pipe: S50
2½" Cooling Equipment: S25

Installation Considerations:
Depending on the square footage and water demands (individual bathroom facilities) additional descalers can be distributed to assist maintenance staff with lowering cleaning efforts. 
• Apartment Buildings
• Cooling Towers
• Boliers
• Return On Investment
N2 – Home For Indigent Children, Aged, Homeless
N2 – Home For Indigent Children, Aged, Homeless

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Main Hot Water Pipe: S100
2" Colling / Equipment Pipes: S10

Installation Considerations:
Depending on the square footage and water demands (individual bathroom facilities) additional descalers can be distributed to assist maintenance staff with lowering cleaning efforts. 
• Apartment Buildings
• Cooling Towers
• Boliers
• Return On Investment
N3 – Orphanage
N3 – Orphanage

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Main Hot Water Pipe: S25
2" Cooling Tower: S10

Installation Considerations:
Placing a larger descaler on the hot water pipe will help keep bathroom facilities cleaner with less effort. The intention of using a larger descaler on the main cold water pipe is to create significantly stronger descaling bonds to descale all water-based equipment (will lower energy demands) and to extend the lifecycle of the descaling effect in other parts of the orphanage without using an additional model.
• Apartment Buildings
• Cooling Towers
• Boliers
• Return On Investment



N4 – Detention House For Wayward Girls
N4 – Detention House For Wayward Girls

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Cooling Tower Pipe: S50

Installation Considerations:
Main objective to remove mineral scale from building equipment and protect from future corrosion.
• Apartment Buildings
• Cooling Towers
• Boliers
• Return On Investment
N9 – Miscellaneous Asylum, Home
N9 – Miscellaneous Asylum, Home

Mineral Descaling Models:
2" Main Water Pipe: S10

Installation Considerations:
To effectively descale basic equipment and appliances with a strong potential to reach other parts of the building as an added benefit.
• Apartment Buildings
• Cooling Towers
• Boliers
• Return On Investment
 


Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Mineral scale causes an increase in energy loss  Vulcan mineral descaler factory industrial NYC



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


M1 – Church, Synagogue, Chapel
M1 – Church, Synagogue, Chapel

Mineral Descaling Models:
4" Main Water Pipe: S50
2" Secondary Water Pipe: S10
4" Main Hot Water Pipe: S50

Installation Considerations:
Depending on the total building size, number of stories and access to piping in a multi-story building, installing a significant larger descaler for the pipe diameter may be a better strategy. Contact us for advice.
• Residential Studies
• Hot Water Tank
M2 – Mission House (Non-Residential)
M2 – Mission House
(Non-Residential)

Mineral Descaling Models:
2" Water Pipe: S25 (per level)

Installation Considerations:
A simple and direct installation plan to offer descaling improvements for each level of this building
• Residential Studies
• Hot Water Tank
M3 – Parsonage, Rectory
M3 – Parsonage, Rectory

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Main Hot Water Pipe: S10

Installation Considerations:
Centrally located descalers to offer a building wide descaling benefit.
• Residential Studies
• Hot Water Tank



M4 – Convent
M4 – Convent

Mineral Descaling Models:
4" Main Water Pipe: S50 / S100
(2 main locations)
4" Main Hot Water Pipe: S100

Installation Considerations:
Centrally located descalers to offer a building wide descaling benefit for a large convent. A large mineral descaler can be placed on the main hot water pipe to offer extensive descaling in all showing facilities to make general cleaning easier.
• Residential Studies
• Hot Water Tank
M9 – Miscellaneous Religious Facility
M9 – Miscellaneous Religious Facility

Mineral Descaling Models:
4" Main Water Pipe: S50

Installation Considerations:
To support descaling efforts for hot water tank/s, water pumps and other centrally located building equipment. Water flowing into upper sections of the building will also help to remove and prevent future mineral deposits in water pipes.
• Residential Studies
• Hot Water Tank
 



Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Mineral scale causes an increase in energy loss  Vulcan mineral descaler factory industrial NYC



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


J1 – Theatre Art Type
J1 – Theatre Art Type
Less Than 400 Seats

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Water Equipment Pipes: S10

Installation Considerations:
Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale this type of building. Additional descaler units can be included with specific root top cooling equipment.
• Office Buildings
• Cooling Towers
J2 – Theatre Art Type More Than 400 Seats
J2 – Theatre Art Type
More Than 400 Seats

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Water Equipment Pipes: S10

Installation Considerations:
Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale this type of building. Additional descaler units can be included with specific root top cooling equipment.
• Office Buildings
• Cooling Towers
A0 Cape Cod
J3 – Motion Picture Theatre
With Balcony

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Water Equipment Pipes: S10

Installation Considerations:
Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale all areas of this type of building. Additional descaler units can be included with specific root top cooling equipment.
• Office Buildings
• Cooling Towers



J4 – Legitimate Theatre, Sole Use
J4 – Legitimate Theatre
Sole Use

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Water Equipment Pipes: S10

Installation Considerations:
Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale all areas of this type of building. Additional descaler units can be included with specific root top cooling equipment.
• Office Buildings
• Cooling Towers
J5 – Theatre In Mixed-Use Building
J5 – Theatre
Mixed-Use Building

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Secondary Pipes: S100
2" Water Equipment Pipes: S10

Installation Considerations:
Depending on the other uses for this building (offices, tenant apartment, etc.) additional descalers or a stronger descaler may be required, if the goal is to descale all water pipe networks in this building type.
• Office Buildings
• Cooling Towers
J6 – Television Studio
J6 – Television Studio

Mineral Descaling Models:
12" Main Water Pipe: S500
8" Hot Water Pipes: S250
4" Secondary Pipes: S50
(1 descaler per 5 levels)
4
" Water Equipment Pipes: S50

Installation Considerations:
If the descaling goal is to only support core-building equipment located in mechanical rooms and roof top cooling towers, then targeting these pieces of equipment with a slightly larger mineral descaler will be an appropriate energy saving strategy. If the building ownership would like to include a holistic descaling strategy to support their sustainability plan then positing descaling units throughout this large building would benefit from a customized approach.
• Office Buildings
• Cooling Towers



J7 – Off Broadway Type Theatre
J7 – Off Broadway Type Theatre

Mineral Descaling Models:
2" Main Water Pipe: S25

Installation Considerations:
Positioning one larger mineral descaler on the core water pipe for this building will be able to generate strong descaling bonds as the water moves through the building. Depending on equipment used (cooling tower, evaporative cooler, etc) an addition descaler should be used to maximize equipment efficiencies and lower maintenance intervals. 
• Office Buildings
• Cooling Towers
J8 – Multiplex Picture Theatre
J8 – Multiplex Picture Theatre

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Secondary Pipes: S50
4" Main Hot Water Pipe: S100
4" Cooling Equipment: S50
(supply and return)

Installation Considerations:
Incorporating an robust descaling strategy will not only help this type of building lower their energy consumption, extend equipment and parts lifespans but also help to keep restroom facilities cleaner with less maintenance staff effort.
• Office Buildings
• Cooling Towers
J9 – Miscellaneous Theatre
J9 – Miscellaneous Theatre

Mineral Descaling Models:
2" Main Water Pipe: S25

Installation Considerations:
One mineral descaler (sized appropriately) will be enough to descale this type of property. An additional mineral can also be used to support specific roof-top  equipment.
• Office Buildings
• Cooling Towers



Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


I1 – Hospital, Sanitarium, Mental Institution
I1 – Hospital, Sanitarium, Mental Institution

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us so we may learn more out how water is used in your health facility.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I2 Infirmary
I2 - Infirmary

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us so we may learn more out how water is used in your health facility.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I3 - Dispensary
I3 - Dispensary

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Support Pipes: S50
4" Cooling Operations: S50
(supply and return)

Installation Considerations:
An installation plan for a dispensary will be similar to an office-building plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc).
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment



I4 – Hospital / Staff Facility
I4 – Hospital / Staff Facility

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Support Pipes: S50
4" Cooling Operations: S50
(supply and return)

Installation Considerations:
An installation plan for a dispensary will be similar to an office-building plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc).
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I5 Health Center, Child Center, Clinic
I5 - Health Center, Child Center, Clinic

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An installation plan for a health center will be similar to a hospital plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc) including extensive descaling through building level pipe lines.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I6 - Nursing Home
I6 - Nursing Home

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Boiler Water Pipe: S100
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(supply and return)

Installation Considerations:
An installation plan for an NYC nursing home will be similar to an apartment plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc) including extensive descaling through building level pipelines. Additional descalers can be used on secondary water pipes to support upper levels; depending on the total builing size. 
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment



I7 - Adult Care Facility
I7 - Adult Care Facility

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Boiler Water Pipe: S100
4" Equipment Support Pipes: S50
(multiple locations)
2" Secondary Pipes: S25
(1 descaler per 2 levels)
4" Cooling Operations: S100
(supply and return)

Installation Considerations:
A less involved installation plan can be implemented if the goal is to only descale primary building equipment.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I9 – Miscellaneous Hospital, Health Care Facility
I9 – Miscellaneous Hospital, Health Care Facility

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us to develop an robust descaling an energy saving plan.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
 



Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
waslix logo purpose
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058
Email: Pierre@Waslix.com