NYC Accelerator lowering pollution carbon emission mineral scale
 

NYC made a commitment to reduce greenhouse gas emissions by 80% by 2050 — this projected level by the United Nations is needed to avoid the most dangerous effects of climate change

NYC logo arrows
 
 



hard water softening and descaling technology vulcan small
red video button

HOW can this technology help support NYC 2050 climate mandates?

pdf largeWaslix: Impulse Frequency Mineral Descaler Technology4.42 MB

Mineral scale deposits in building support equipment (cooling towers, heat exchange plates, boilers, water pipes, valves, and other equipment interacting with water) has been shown to increase energy consumption, water demands, lowered equipment and support component part lifecycles. U.S. Department of Energy Report (PNNL-22921) under Contract DE-AC05-76RL01830

Over 40 years of product development across 70 countries has allowed this sophisticated technology to effectively remove existing mineral scale build-up and prevent new hard water scale bonds from forming. Unlike water softening resins, media and other similar water softening processes this proprietary wobbling impulse frequencies tech accelerates a natural occurring phenomenon to dismantle and restructure mineral bonds without affecting water chemistry, as observed with other water softening process, while eliminating mineral scale.

Other than approx. 2 watts of electrical energy, no other consumables are used with this technology to prevent and loosen existing mineral scale; making this technology a truly eco-friendly inclusion tool to lower your building’s carbon footprint.
 



redevelopment

Please excuse our messy website!
We are developing a custom content management function to effectively communicate simple to high involvement products and solutions. Our new software should be ready to implement by April 30, 2024. Go exploring… 
Contact us at 412-848-5058 or info@waslix.com with any questions.


Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


O1 – Office Only
O1 – Office Only
1 Story

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Cooling Operations Pipe: S50
2" Secondary Level Pipes: S10

Installation Considerations:
This building type can be up to 9 stories high and the office environment covers 1 story. The primary descaling purpose would be to support building equipment. Additional descaler can be installed for each level.
• Office Buildings
• Cooling Towers
• Boliers
O2 – Office Only
O2 – Office Only
2 – 6 Stories

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Cooling Operations Pipes: S50
3" Secondary Water Pipe: S50

Installation Considerations:
The primary descaling purpose would be to support building equipment- typically grouped in a mechanical room. A stronger descaler would be installed on the primary water pip for the building as a centralized treatment location. Additional descaler can be installed on rooftop equipment.
• Office Buildings
• Cooling Towers
• Heat Exchangers
O3 – Office Only
O3 – Office Only
7 – 19 Stories

Mineral Descaling Models:
10" Main Water Pipe: S350
6" Booster Pump Pipes: S150
4" Secondary Level Pipe: S25
4" Cooling Tower: S50

Installation Considerations:
A standard installation plan is to always install a mineral descaler on the primary water pipe that supplies the building with water. This descales the water before it comes into company with any mechanical components, parts or filters. A primary concern will be to remove and prevent mineral scaling in building support equipment to lower energy costs, extend equipment lifespans and decrease general maintenance.
• Office Buildings
• Cooling Towers
• Heat Exchangers



O4 – Office Only With Or Without Comm
O4 – Office Only With Or Without Commerce
20 Stories Or More

Mineral Descaling Models:
10" Main Water Pipe: S350
8" Main Hot Water Pipe: S150
(1 descaler every 6 stories)
6" Cooling Operations: S150
4" Equipment Pipes: S50
4" Secondary Level Pipes: S50
(1 descaler every 3 stories)

Installation Considerations:
The best approach for a building of this use and size would be to support individual equipment. If there is an interest to descale the entire build as part of a holistic energy and sustainability plan to then incorporate multiple mineral descalers instead of relying on one or two very large descalers.
• Office Buildings
• Return On Investment
O5 – Office With Comm
O5 – Office With Commerce
1 To 6 Stories

Mineral Descaling Models:
8" Main Water Pipe: S150
4" Equipment Pipes: S50
4" Main Hot Water Pipe: S50
2" Cooling Operations: S10
2" Secondary Level Pipes: S10
(1 descaler every 3 stories)

Installation Considerations:
If the building ownership is interested in descaling the entire building it would be better to install multiple descalers. 1-3 larger descalers installed on primary water supply lines could also be used but installing smaller descalers in strategic locations will reenergize the water as it moves through the building (and equipment) creating even long and stronger descaling bonds.
• Office Buildings
• Cooling Towers
• Heat Exchangers
O6 – Office With Comm
O6 – Office With Commerce
7 – 19 Stories

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Pipes: S50
2½" Cooling Operations: S50

Installation Considerations:
This installation primary purpose is to support building equipment to lower energy consumption and the wasted water associated with cooling tower blow downs. A secondary descaling benefit will occur over time in general water pipe lines as water circulates from street to upper building levels.
• Office Buildings
• Cooling Towers
• Return On Investment



O7 – Professional Buildings
O7 – Professional Buildings
(Stand Alone Funeral Homes)

Mineral Descaling Models:
4" Main Water Pipe: S100
4" Main Hot Water Pipe: none
2" Building Equipment: S25
(cooling tower, heat exchanger, etc)

Installation Considerations:
Using a stronger mineral descaler on the main cold water pipe line will carry the benefit through hot water tanks/ boilers/ heat exchangers and into the hot water supply for restroom facilities.
• Office Buildings
• Heat Exchangers
O8 – Office With Apartments Only
O8 – Office With Apartments Only
(No Commerce)

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Building Equipment: S10
(cooling tower, heat exchanger, etc)
¾" Tenant Units: V5000

Installation Considerations:
Installing smaller mineral descalers on the main water pipe entering tenant units will reenergize the water to offer a stronger descaling benefit in water heaters and general appliances. This will help to prevent shortened water heater lifespans caused by mineral scale damage that often results in water tanks bursting and leaking.
• Apartment Buildings
• Return On Investment
O9 – Miscellaneous And Old Style Bank Buildings
O9 – Miscellaneous And Old Style Bank Buildings

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Pipes: S50
4" Main Hot Water Pipe: S100
2" Cooling Operations: S10
2" Secondary Level Pipes: S10
(1 descaler every 4-5 stories)

Installation Considerations:
This type of building can benefit greatly from a holistic mineral descaling plan to help prevent future corrosion and repetitive general maintenance involved with preplacing degraded equipment parts connected to mineral scaling corrosion.
• Office Buildings
• Return On Investment


Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


L1 – Loft Over 8 Stories
L1 – Loft Over 8 Stories
(Mid Manhattan Type)

Mineral Descaling Models:
8" Main Water Pipe: S350
4" Main Hot Water Pipe: S50

Installation Considerations:
Additional mineral descaling models may be required based on the core water based equipment and machinery used to support this building.
• Office Buildings
• Cooling Towers

L2 – Loft Fireproof And Storage
L2 – Loft Fireproof And Storage
(Without Stores)

Mineral Descaling Models:
8" Main Water Pipe: S250
(multiple locations)
6" Main Hot Water Pipe: S150
2½" Cooling Tower Pipe: S25

Installation Considerations:
This installation is based on a higher occupancy rate than L1 Loft buildings. Instead of installing 1 significantly larger descaler model to descale the entire building smaller descaler can be positional on primary water pipes to support multiple levels.
• Office Buildings
• Cooling Towers

L3 – Loft Semi-Fireproof
L3 – Loft Semi-Fireproof

Mineral Descaling Models:
8" Main Water Pipe: S250
(multiple locations)
3½" Main Hot Water Pipe: S50
2½" Cooling Tower Pipe: S25

Installation Considerations:
This installation is based on a higher occupancy rate than L1 Loft buildings. Instead of installing 1 significantly larger descaler model to descale the entire building smaller descaler can be positional on primary water pipes to support multiple levels.
• Office Buildings
• Cooling Towers




L8 – Loft With Retail Stores
L8 – Loft With Retail Stores
(Other Than Type One)

Mineral Descaling Models:
6" Main Water Pipe: S150
(multiple locations)
3½" Main Hot Water Pipe: S50
2" Retail Support Pipes: S10
2½" Evaporative Cooling: S25

Installation Considerations:
Lofts used as a residential dwelling will have a different installation plan that an office occupied space due to the higher water demands.
• Office Buildings
• Cooling Towers
L9 – Miscellaneous Loft
L9 – Miscellaneous Loft

Mineral Descaling Models:
6" Main Water Pipe: S250
(basement/ street level and upper half)
3½" Main Hot Water Pipe: S100
2½" Evaporative Cooling: S25

Installation Considerations:
If part of the loft space I being used by a health club/ gym, a stronger descaler can be used on the primary hot water pipe. This will significantly help to keep showering and change room facilities cleaner with less effort.
• Office Buildings
• Cooling Towers

 


Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


K1 – One Story Retail
K1 – One Story Retail

Mineral Descaling Models:
1" Main Water Pipe: V5000

Installation Considerations:
If your building occupies a large square footage on one level and you are interested in descaling all  the piping you may require an additional descaler. A dedicated descaler can also be used to support heating and cooling equipment.
• Shopping Center/ Stores
K2 – Multi-Story Retail
K2 – Multi-Story Retail
(2 Or More)

Mineral Descaling Models:
4" Main Water Pipe: S50
2" Cooling Tower: S10

Installation Considerations:
Installing additional mineral descalers may be necessary to maximize the efficiencies of your equipment (cooling tower units, pumps, heat exchanges, etc) based on the total size and stories of your building. Contact us for a customized plan.
• Shopping Center/ Stores
• Cooling Towers
K3 – Multi-Story Department Store
K3 – Multi-Story Department Store

Mineral Descaling Models:
8" Main Water Pipe: S350
6" Main Hot Water Pipe: S150
4" Cooling Tower Pipes: S50
2" Chiller Pipes: S25

Installation Considerations:
The predominant water usage will be used in water supply to bathroom facilities, sprinkler systems, building cooling operations, etc. Unlike apartment or hotel building of equal size, installing multiple descalers to compensate for higher water demands is not necessary in a multi-story department type of building.
• Shopping Mall



"K4
K4 – Predominant Retail
With Other Uses

Mineral Descaling Models:
10" Main Water Pipe: S500
4" Secondary Hot Water: S50
(multiple: 1 unit to support 2-5 levels)
4" Cooling Operations:
• Cooling Tower: S50
• Chiller: S50

Installation Considerations:
Varying water demands are expected. Installing a significantly larger mineral descaler on the main water pipe entering the building will ensure core water based mechanical equipment is thoroughly descaled before the water supply is pushed to upper levels. Depending on the size and function of the building additional mineral descaler may be necessary on various levels to recharge the water supply.
• Shopping Center/ Stores
• Cooling Towers
K5 – Stand-Alone Food Establishmentd
K5 – Stand-Alone Food Establishment

Mineral Descaling Models:
1" Main Water Pipe: V5000

Installation Considerations:
The Vulcan 5000 model is robust solution for this type of property and can effectively treat water flowing at up to 35 GPM. One descaler installed on a main water line can support water pipes, commercial dishwashers, toilet facilities, grease traps, etc
• Food Service Industry
• Wolfies Waterfront Grill

K6 – Shopping Center
K6 – Shopping Center
With Or Without Parking

Mineral Descaling Models:
8" Main Water Pipe: S250
(installation: 1-3+ locations)
4" Cooling Operations:
• Cooling Tower: S100
• Chiller: S100

Installation Considerations:
Shopping center locations are typically shorter buildings with larger square foot  size per story. Descaling all the water pipes through the building will benefit more from slightly stronger descaling units positioned in several pipe locations. Additional mineral descaler/s will be incorporated into the cooling network of the property. This will lower energy demands, lower cooling tower blowdowns, reduced water waste, lowered maintenance checks and all other associated labor requirements.
• Shopping Mall



K7 – Banking Facilitiesd
K7 – Banking Facilities
With Or Without Parking

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Cooling Operations:
• Cooling Tower: S50
• Chiller: S25

Installation Considerations:
Similar to an office based environment maimed at reducing energy demands in building support equipment and descaling general water pipes and pumps to extend the operating lifespan of equipment and prevent corrosion.
• Office Buildings
• Boliers
K9 – Miscellaneous Store Building
K9 – Miscellaneous Store Building

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Cooling Operations:
• Cooling Tower: S50
• Chiller: S25

Installation Considerations:
Contact us to help you choose the best installation plan for your building.
• Shopping Center/ Stores
• Boliers
• Cooling Towers
 


Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


A0 Cape Cod
H1 – Luxury Hotel
(built prior to 1960)

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Hot Water Pipe: S100
4" Cooling Tower Pipe: S50

Installation Considerations:
Cooling Towers: a descaler on the return line near the rooftop cooling stack and another on the supply line near the chiller.
Additional descalers may be required on primary cold water lines to ensure adequate descaling on upper levels.
• Hotel Case Studies
• Angsana Xi'an Lintong
• Barcelo Hotel Group
A0 Cape Cod
H2 – Full Service Hotel
(built after 1960)

Mineral Descaling Models:
10" Main Water Pipe: S350
6" Hot Water Pipe: S150
4" Cooling Tower Pipe: S50
(supply and return lines)

Installation Considerations:
Additional descalers may be required on primary cold water lines to ensure adequate descaling on upper levels. Descalers can be included in other functions and facilities of the hotel such as the kitchen, pool to lower general cleaning intervals, and before water filtration and UV equipment.
• Hotel Case Studies
• Comfort Inn and Suites
• Barcelo Hotel Group
A0 Cape Cod
H3 – Limited Service
(Transient Occupancy/ Chains)

Mineral Descaling Models:
10" Main Water Pipe: S350
6" Hot Water Pipe: S150
4" Cooling Tower Pipe: S50
(supply and return lines)

Installation Considerations:
Additional descalers may be required on primary cold water lines to ensure adequate descaling on upper levels. Descalers can be included in other functions and facilities of the hotel such as the kitchen, pool to lower general cleaning intervals, and before water filtration and UV equipment.
• Hotel Case Studies
• Comfort Inn and Suites
• Barcelo Hotel Group



A0 Cape Cod
H4 – Motel

Mineral Descaling Models:
4" Main Water Pipe: S100
3½" Hot Water Pipe: S25

Installation Considerations:
An additional descaler can also be used to provide additional support to the onsite laundry facilities to extend the lifespan of commercial equipment. Pilbara Commercial Laundry Service case study saves $10,000+ every 2 years.
• Hotel Case Studies
• Comfort Inn and Suites
• Habitat Suites
A0 Cape Cod
H5 – Hotel
(Private Club, Luxury Type)

Mineral Descaling Models:
6" Main Water Pipe: S250
6" Hot Water Pipe: S150
4" Cooling Tower Pipe: S50
(supply and return lines)
2" Shower Pipes: S25
2" Laundry Facility: S25

Installation Considerations:
Mineral descalers  are spread out throughout the hotel to continuously reenergize the water supply in strategic locations. This will dramatically lower general maintenance and cleaning by the hotel maintenance staff.
• Hotel Case Studies
• Palm Beach Club Hammamet
• Holiday Resort Lombok
A0 Cape Cod
H6 – Apartment Hotel

Mineral Descaling Models:
10" Main Water Pipe: S350
6" Hot Water Pipe: S150
4" Cooling Tower Pipe: S50
(supply and return lines)

Installation Considerations:
Additional descalers may be required on primary cold water lines to ensure adequate descaling on upper levels. Descalers can be included in other functions and facilities of the hotel such as the kitchen, pool to lower general cleaning intervals, and before water filtration and UV equipment.
• Hotel Case Studies
• Comfort Inn and Suites
• 30 Year Old Apartment



A0 Cape Cod
H7 – Apartment Hotel
Cooperatively Owned

Mineral Descaling Models:
10" Main Water Pipe: S350
6" Hot Water Pipe: S150
4" Cooling Tower Pipe: S50
(supply and return lines)

Installation Considerations:
Additional descalers may be required on primary cold water lines to ensure adequate descaling on upper levels. Descalers can be included in other functions and facilities of the hotel such as the kitchen, pool to lower general cleaning intervals, and before water filtration and UV equipment. Owners of individual units can use the V5000 model on the apartment’s main water pipe. This 30 year old apartment owner notices improvements within 1 hour.
• Hotel Case Studies
• Comfort Inn and Suites
• Barcelo Hotel Group
A0 Cape Cod
H8 – Dormitory

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Hot Water Pipe: S50
(various locations)
4" Cooling Tower Pipe: S50 / S100
(supply and return lines)

Installation Considerations:
If access to primary water lines and available power outlets is restricted in narrow crawl spaces it would be better to install a significantly larger model (example: S350 / S500) on basement water pipes to support the dormitory building.
• Hotel Case Studies
• Comfort Inn and Suites
• Underground Installation
A0 Cape Cod
H9 – Miscellaneous Hotel

Mineral Descaling Models:
10" Main Water Pipe:S500

Installation Considerations:
This installation approach uses a descaler for a 20” max pipe diameter on a 10” water pipe. The building’s water control equipment and pumps are location on street/ basement level. The additional descaling strength will be required to reach upper levels of the hotel.
• Hotel Case Studies
• Royalton Punta Cana Resort & Casino



A0 Cape Cod
HB – Boutique
10-100 Rooms, Luxury Facilities, Themed, Stylish, Full Service

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Secondary Pipes: S50
4" Hot Water Pipe: S50
2" Pool: S50
2" Laundry: S10
4" Cooling Tower Pipe: S50
(supply and return lines)

Installation Considerations:
Additional descalers may be required on primary cold water lines to ensure adequate descaling on upper levels. Descalers can be included in other functions and facilities of the hotel such as the kitchen, pool to lower general cleaning intervals, and before water filtration and UV equipment.
• Hotel Case Studies
• Comfort Inn and Suites
• Barcelo Hotel Group
A0 Cape Cod
HH – Hostels- Bed Rentals In Dormitory-Like Settings
with shared rooms & bathrooms

Mineral Descaling Models:
4" Main Water Pipe: S100
4" Hot Water Pipe: S50

Installation Considerations:
The motivation for this type of building may be to prevent mineral scaling in boiler equipment and to minimize general cleaning in shared bathroom facilities. If this is a larger building with several floors, ownership may want to consider using additional mineral descalers on primary hot water pipes on higher levels. This will recharge the water as it approaches upper levels to help lower the time and effort s required to keep showering facilities clean.
• Hotel Case Studies
• Comfort Inn and Suites
• An Inn in Tibet
A0 Cape Cod
HR – Sro- 1 Or 2 People Housed In Individual Rooms
in multiple affordable housing dwellings

Mineral Descaling Models:
6" Main Water Pipe: S250
6" Hot Water Pipe: S150
4" Cooling Tower Pipe: S50 / S25
(supply and return lines)

Installation Considerations:
Although the main water pipes may be 6 inch diameters; using a stronger centralized descaler may be adequate to offer a descaling solution for this type of building (depending on total size) without having to use additional descalers in various parts of the building. This type of installation plan may be centered around providing a simple long-term descaling solution with minimal overall investment.
• Hotel Case Studies
• Apartment in China
• Apartment in France



A0 Cape Cod
HS – Extended Stay Suite
amenities similar to apartments, typically charge weekly rates and less expensive than full-service hotels

Mineral Descaling Models:
10" Main Water Pipe: S500
6" Main Hot Water Pipe: S250
3½" Supporting Hot Water Pipe: S25
2" Laundry Pipes: S10
4" Cooling Tower Pipe: S50
(supply and return lines)

Installation Considerations:
If this is a high raised style building, it will be necessary to install a significantly larger descaler on the main water pipe if the intention is to support upper levels without using additional support models. This type of building may want to maximize descaling efforts throughout the building to create a holistic energy saving plan, maximize the lifespan of support equipment and lower general cleaning cycles.
• Hotel Case Studies
• Comfort Inn and Suites
• Guanfang Hotel
• Ralons Lavanderia Laundry Services
 
 


Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until building specific variables are considered.
waslix logo purpose
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058
Email: Pierre@Waslix.com