Cooling Tower in a Medicine Factory
After Vulcan was installed for some months, the scale in the cooling tower, plate heat exchanger and the pipe become soft; and it can be removed easily with a finger.
Model: Vulcan S100
Location: Japan
Installation Area: Cooling Towers
Circulation Water Capacity: 100 m3/h
Pipe Diameter: 150 A
The purpose:
1. Prevents from scale
2. Prevents from heat exchanger effectiveness loss
3. Cleaning maintenance cost of plate heat exchanger can be reduced
The effect:
After Vulcan was installed for some months, the scale in the cooling tower, plate heat exchanger and the pipe become soft; and it can be removed easily with a finger.
Before Vulcan was installed: the outside of the cooling tower.
After Vulcan was installed for 5 months: the scale can be removed easily with a finger.
Before Vulcan was installed: the inside of the cooling tower.
After Vulcan was installed for 5 months: the scale has been reduced.
After the Vulcan was installed for 9 months: the plate heat exchanger was taken apart for cleaning.
After the Vulcan was installed for 9 months: simply open the plate heat exchanger and clean.
The scale on the plate heat exchanger becomes soft.
The scale can be easily removed.
Circulation pipe
The scale in the circulation pipe can also be easily removed with a finger.