Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: A holistic plan to descale the entire school to maximize energy efficiencies and extending the lifespan of pumps, equipment parts, and other water based equipment. |
| • Schools • Energy Efficiency Studies • Irrigation |
|
Mineral Descaling Models: |
| Installation Considerations: Additional mineral descaler installed in various parts of the school may be required, depending on total school square footage and equipment used. |
| • Schools • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: Additional mineral descalers could be required, depending on total school square footage and equipment used. |
| • Schools • Return On Investment • Irrigation |
|
Mineral Descaling Models: |
| Installation Considerations: Depending on the school’s total square footage, equipment used and ultimate goal; additional mineral descalers could be required. |
| • Schools • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: If the University is interested in eliminating scale buildup in typical equipment (boilers, heat exchangers, cooling towers, pumps, etc) then sizing the appropriate model with be to match or exceed pipe diameter to descaler model specifications. Contact us to develop an installation plan to descale the campus as part of the University’s sustainability goals. |
| • Schools • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: If the University is interested in eliminating scale buildup in typical equipment (boilers, heat exchangers, cooling towers, pumps, etc) then sizing the appropriate model with be to match or exceed pipe diameter to descaler model specifications. Contact us to develop an installation plan to descale the campus as part of the University’s sustainability goals. |
| • Schools • Pool and Spa • Irrigation |
|
Mineral Descaling Models: |
| Installation Considerations: Contact us to develop a holistic installation plan to maximize energy efficiencies in mineral scale problem areas. |
| • Schools • Pool and Spa • Irrigation |
|
Mineral Descaling Models: |
| Installation Considerations: Contact us to develop a holistic installation plan to maximize energy efficiencies in mineral scale problem areas. |
| • Schools • Pool and Spa • Irrigation |
|
Mineral Descaling Models: |
| Installation Considerations: Remove mineral scale from vital building equipment before addressing a holistic plan to descale the entire building. |
| • Schools • Pool and Spa • Irrigation |
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: The mineral descalers can be included in the park/ recreation facility’s irrigation system and fountains to prevent mineral scale blockages. |
| • Pool and Spa • Sport Complex |
| Installation Considerations: Not applicable unless there is a water feature that required descaling |
| • Pool and Spa • Sport Complex |
|
Mineral Descaling Models: |
| Installation Considerations: An important consideration will be the rate the water pumps circulate the pool water more than the diameter of the pipes. |
| • Pool and Spa • Sport Complex |
| Installation Considerations: Not applicable unless there is a water feature that required descaling |
|
Mineral Descaling Models: |
| Installation Considerations: An entire irrigation system for a golf course can be supported to prevent sprinklers from becoming blocked with mineral scale. |
| • Gold Course • Irrigation |
|
Mineral Descaling Models: |
| Installation Considerations: Contact us so we can map the stadium’s water piping network to develop a custom installation plan. |
| • Sport Complex • Irrigation |
| Installation Considerations: Not applicable |
| • Case Studies • Case Studies |
|
Mineral Descaling Models: |
| Installation Considerations: Installing one mineral descaler for the marina building will be adequate |
| • Return On Investment |
| Installation Considerations: Contact us for the facility’s specific need |
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: Using a significantly larger descaler on the main cold water pipe to dramatically improve the descaling benefits of nearby equipment while supporting continued descaling efforts in upper levels. It will not be necessary to use a descaler on the hot water pipe coming from the boiler because the hot water supply is not used to support bathing facilities. |
| • Energy Efficiency Studies • Sport Complex |
|
Mineral Descaling Models: |
| Installation Considerations: A simple and direct installation plan to offer descaling improvements for each level of this building. Use additional descalers for semi-closed loop cooling tower / evaporative cooler operations. |
| • Energy Efficiency Studies • Apartment Buildings |
|
Mineral Descaling Models: |
| Installation Considerations: Using multiple descalers in various parts of this type of community building where water demands are higher is a better descaling and energy saving plan than relying on 1-3 significantly larger models to accomplish the same goal. |
| • Return On Investment • Fitness Centers |
|
Mineral Descaling Models: |
| Installation Considerations: This installation plan is to maximize the descaling effect to dramatically improve energy savings in the shortest period, extend descaling impacts in showering facilities, and extend pool and spa filter lifespans. |
| • Return On Investment • Pool and Spa |
|
Mineral Descaling Models: |
| Installation Considerations: If it is possible to access the hot water pipes near showing facilities, smaller mineral descalers can be installed to help keep these areas cleaner with less chemical used to achieve the same result. |
| • Return On Investment • Energy Efficiency Studies • Sport Complex |
|
Mineral Descaling Models: |
| Installation Considerations: Amusement Place: 2” Main Water Pipe: V5000- positioned in multiple locations Boat House: ¾” Pipe: V3000 Bath House: Water demands are extensive- spas, showering, hot pools, etc. Contact us so we can learn more about how your facility uses water, water filtration equipment, GPM water flows, etc. |
| • Residential Studies • Pool and Spa |
|
Mineral Descaling Models: |
| Installation Considerations: Typically, museums occupy a large square footage. Although their water demands are not as intensive as high-rise apartments, cooling and other support equipment will need to be given close attention. |
| • Energy Efficiency Studies • Return On Investment • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Supporting the library cooling operation system and other equipment would be the primary focus. Descaling general piping network would involve using 1-3 descaling units; depending on total square foot and stories. |
| • Energy Efficiency Studies • Return On Investment • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Contact us so we may track your building’s water pipe network and supported equipment for the best installation strategy. |
| • Energy Efficiency Studies • Return On Investment • Cooling Towers |
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: Depending on the square footage and water demands (individual bathroom facilities) additional descalers can be distributed to assist maintenance staff with lowering cleaning efforts. |
| • Apartment Buildings • Cooling Towers • Boliers • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: Depending on the square footage and water demands (individual bathroom facilities) additional descalers can be distributed to assist maintenance staff with lowering cleaning efforts. |
| • Apartment Buildings • Cooling Towers • Boliers • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: Placing a larger descaler on the hot water pipe will help keep bathroom facilities cleaner with less effort. The intention of using a larger descaler on the main cold water pipe is to create significantly stronger descaling bonds to descale all water-based equipment (will lower energy demands) and to extend the lifecycle of the descaling effect in other parts of the orphanage without using an additional model. |
| • Apartment Buildings • Cooling Towers • Boliers • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: Main objective to remove mineral scale from building equipment and protect from future corrosion. |
| • Apartment Buildings • Cooling Towers • Boliers • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: To effectively descale basic equipment and appliances with a strong potential to reach other parts of the building as an added benefit. |
| • Apartment Buildings • Cooling Towers • Boliers • Return On Investment |
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: Depending on the total building size, number of stories and access to piping in a multi-story building, installing a significant larger descaler for the pipe diameter may be a better strategy. Contact us for advice. |
| • Residential Studies • Hot Water Tank |
|
Mineral Descaling Models: |
| Installation Considerations: A simple and direct installation plan to offer descaling improvements for each level of this building |
| • Residential Studies • Hot Water Tank |
|
Mineral Descaling Models: |
| Installation Considerations: Centrally located descalers to offer a building wide descaling benefit. |
| • Residential Studies • Hot Water Tank |
|
Mineral Descaling Models: |
| Installation Considerations: Centrally located descalers to offer a building wide descaling benefit for a large convent. A large mineral descaler can be placed on the main hot water pipe to offer extensive descaling in all showing facilities to make general cleaning easier. |
| • Residential Studies • Hot Water Tank |
|
Mineral Descaling Models: |
| Installation Considerations: To support descaling efforts for hot water tank/s, water pumps and other centrally located building equipment. Water flowing into upper sections of the building will also help to remove and prevent future mineral deposits in water pipes. |
| • Residential Studies • Hot Water Tank |
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale this type of building. Additional descaler units can be included with specific root top cooling equipment. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale this type of building. Additional descaler units can be included with specific root top cooling equipment. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale all areas of this type of building. Additional descaler units can be included with specific root top cooling equipment. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Using a stronger mineral descaler than the main water pipe diameter will create longer and stronger descaling crystal bonds to descale all areas of this type of building. Additional descaler units can be included with specific root top cooling equipment. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Depending on the other uses for this building (offices, tenant apartment, etc.) additional descalers or a stronger descaler may be required, if the goal is to descale all water pipe networks in this building type. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: If the descaling goal is to only support core-building equipment located in mechanical rooms and roof top cooling towers, then targeting these pieces of equipment with a slightly larger mineral descaler will be an appropriate energy saving strategy. If the building ownership would like to include a holistic descaling strategy to support their sustainability plan then positing descaling units throughout this large building would benefit from a customized approach. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Positioning one larger mineral descaler on the core water pipe for this building will be able to generate strong descaling bonds as the water moves through the building. Depending on equipment used (cooling tower, evaporative cooler, etc) an addition descaler should be used to maximize equipment efficiencies and lower maintenance intervals. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: Incorporating an robust descaling strategy will not only help this type of building lower their energy consumption, extend equipment and parts lifespans but also help to keep restroom facilities cleaner with less maintenance staff effort. |
| • Office Buildings • Cooling Towers |
|
Mineral Descaling Models: |
| Installation Considerations: One mineral descaler (sized appropriately) will be enough to descale this type of property. An additional mineral can also be used to support specific roof-top equipment. |
| • Office Buildings • Cooling Towers |
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
|
Mineral Descaling Models: |
| Installation Considerations: An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us so we may learn more out how water is used in your health facility. |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us so we may learn more out how water is used in your health facility. |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: An installation plan for a dispensary will be similar to an office-building plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc). |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: An installation plan for a dispensary will be similar to an office-building plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc). |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: An installation plan for a health center will be similar to a hospital plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc) including extensive descaling through building level pipe lines. |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: An installation plan for an NYC nursing home will be similar to an apartment plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc) including extensive descaling through building level pipelines. Additional descalers can be used on secondary water pipes to support upper levels; depending on the total builing size. |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: A less involved installation plan can be implemented if the goal is to only descale primary building equipment. |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |
|
Mineral Descaling Models: |
| Installation Considerations: An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us to develop an robust descaling an energy saving plan. |
| • Health Care Studies • Energy Efficiency Studies • Return On Investment |