Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.
Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.
Q1 – Parks/ Recreation Facility
Mineral Descaling Models: |
Installation Considerations: The mineral descalers can be included in the park/ recreation facility’s irrigation system and fountains to prevent mineral scale blockages. |
• Pool and Spa • Sport Complex |
Q2 – Playground
Installation Considerations: Not applicable unless there is a water feature that required descaling |
• Pool and Spa • Sport Complex |
Q3 – Outdoor Pool
Mineral Descaling Models: |
Installation Considerations: An important consideration will be the rate the water pumps circulate the pool water more than the diameter of the pipes. |
• Pool and Spa • Sport Complex |
Q4 – Beach
Installation Considerations: Not applicable unless there is a water feature that required descaling |
Q5 – Golf Course
Mineral Descaling Models: |
Installation Considerations: An entire irrigation system for a golf course can be supported to prevent sprinklers from becoming blocked with mineral scale. |
• Gold Course • Irrigation |
Q6 – Stadium, Race Track, Baseball Field
Mineral Descaling Models: |
Installation Considerations: Contact us so we can map the stadium’s water piping network to develop a custom installation plan. |
• Sport Complex • Irrigation |
Q7 – Tennis Court
Installation Considerations: Not applicable |
• Case Studies • Case Studies |
Q8 – Marina, Yacht Club
Mineral Descaling Models: |
Installation Considerations: Installing one mineral descaler for the marina building will be adequate |
• Return On Investment |
Q9 – Miscellaneous Outdoor Recreational Facility
Installation Considerations: Contact us for the facility’s specific need |
Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.