NYC Accelerator logo white small

Mineral scaling has been proven to increase energy consumption, decrease equipment longevity and waste water in building support equipment

“NYC climate commitment is to reduce greenhouse gas emissions by 80% by 2050”

NYC Accelerator remove mineral scale save energe climate
 
NYC Accelerator badge small


NYC Building Classifications


Class I Buildings - Hospitals And Health




 

redevelopment

Please excuse our messy website!
We are developing a custom content management function to effectively communicate simple to high involvement products and solutions. Our new software should be ready to implement by May 31, 2024. Go exploring… 
Contact us at 412-848-5058 or info@waslix.com with any questions.


Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


I1 – Hospital, Sanitarium, Mental Institution
I1 – Hospital, Sanitarium, Mental Institution

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us so we may learn more out how water is used in your health facility.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I2 Infirmary
I2 - Infirmary

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us so we may learn more out how water is used in your health facility.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I3 - Dispensary
I3 - Dispensary

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Support Pipes: S50
4" Cooling Operations: S50
(supply and return)

Installation Considerations:
An installation plan for a dispensary will be similar to an office-building plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc).
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment



I4 – Hospital / Staff Facility
I4 – Hospital / Staff Facility

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Support Pipes: S50
4" Cooling Operations: S50
(supply and return)

Installation Considerations:
An installation plan for a dispensary will be similar to an office-building plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc).
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I5 Health Center, Child Center, Clinic
I5 - Health Center, Child Center, Clinic

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An installation plan for a health center will be similar to a hospital plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc) including extensive descaling through building level pipe lines.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I6 - Nursing Home
I6 - Nursing Home

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Boiler Water Pipe: S100
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(supply and return)

Installation Considerations:
An installation plan for an NYC nursing home will be similar to an apartment plan with the intention to support typical building equipment (boilers, cooing tower, pumps, etc) including extensive descaling through building level pipelines. Additional descalers can be used on secondary water pipes to support upper levels; depending on the total builing size. 
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment



I7 - Adult Care Facility
I7 - Adult Care Facility

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Boiler Water Pipe: S100
4" Equipment Support Pipes: S50
(multiple locations)
2" Secondary Pipes: S25
(1 descaler per 2 levels)
4" Cooling Operations: S100
(supply and return)

Installation Considerations:
A less involved installation plan can be implemented if the goal is to only descale primary building equipment.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
I9 – Miscellaneous Hospital, Health Care Facility
I9 – Miscellaneous Hospital, Health Care Facility

Mineral Descaling Models:
8" Main Water Pipe: S350
(multiple locations)
4" Equipment Support Pipes: S50
(multiple locations)
4" Cooling Operations: S100
(multiple locations)
2" Secondary Pipes: S25
(1 descler per level)

Installation Considerations:
An effective mineral descaling plan for a hospital environment will require an extensive installation plan with multiple descaling units installed in strategic locations to support general water supply and the various building equipment necessary to support the facility. Contact us to develop an robust descaling an energy saving plan.
• Health Care Studies
• Energy Efficiency Studies
• Return On Investment
 



Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
waslix logo purpose
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058
Email: Pierre@Waslix.com