Contact Waslix: (412) 848-5058 facebook facebook group




 

NYC Accelerator logo white small

Mineral scaling has been proven to increase energy consumption, decrease equipment longevity and waste water in building support equipment

“NYC climate commitment is to reduce greenhouse gas emissions by 80% by 2050”

NYC Accelerator remove mineral scale save energe climate
 
NYC Accelerator badge small


NYC Building Classifications


Class W Buildings - Educational Structures




 
Max. Specifications:
Model Diameter Water Flow
V3000 1 ½ inches 13 GPM
V5000  2 inch
 35 GPM
S10  3 inch
 65 GPM
S25  4 inch
 130 GPM
S50  5 inch
 300 GPM
S100  6 inch
 530 GPM
S150  8 inch
 790 GPM
S250  10 inch
 1,540 GPM
S350  14 inch
 2,200 GPM
S500  20 inch
 3,520 GPM
X-PRO 1  30 inch
 UNLIMITED
X-PRO 2  40 inch  UNLIMITED
       pdfSpacing Requirements
warning smallNYC buildings account for 68% of the city’s carbon emissions.
Mineral scale causes an increase in energy loss  Vulcan mineral descaler factory industrial NYC



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


W1 – Public Elementary, Junior or Senior High
W1 – Public Elementary, Junior or Senior High

Mineral Descaling Models:
6" Main Water Pipe: S150
(multiple locations)
4" Main Hot Water Pipe: S50
(multiple locations)
3½" Colling Towers: S50
4" Pool Pipes: S100
2" Irrigation Pipes: S10

Installation Considerations:
A holistic plan to descale the entire school to maximize energy efficiencies and extending the lifespan of pumps, equipment parts, and other water based equipment.
• Schools
• Energy Efficiency Studies
• Irrigation
W2 – Parochial School, Yeshiva
W2 – Parochial School, Yeshiva

Mineral Descaling Models:
4" Main Water Pipe: S100
4" Main Hot Water Pipe: S50
2" Cooling Operations: S10

Installation Considerations:
Additional mineral descaler installed in various parts of the school may be required, depending on total school square footage and equipment used.
• Schools
• Energy Efficiency Studies
• Return On Investment
W3 – School or Academy
W3 – School or Academy

Mineral Descaling Models:
6" Main Water Pipe: S150
(multiple locations)
2" Main Hot Water Pipe: S25
(multiple locations- support showering facilities)
4" Equipment Pipes: S25

Installation Considerations:
Additional mineral descalers could be required, depending on total school square footage and equipment used.
• Schools
• Return On Investment
• Irrigation



W4 – Training School
W4 – Training School

Mineral Descaling Models:
4" Main Water Pipe: S100
2" Cooling Tower Pipes: S25

Installation Considerations:
Depending on the school’s total square footage, equipment used and ultimate goal; additional mineral descalers could be required.
• Schools
• Return On Investment
AW5 – City University
W5 – City University

Mineral Descaling Models:
Customized installation plan will be required

Installation Considerations:
If the University is interested in eliminating scale buildup in typical equipment (boilers, heat exchangers, cooling towers, pumps, etc) then sizing the appropriate model with be to match or exceed pipe diameter to descaler model  specifications. Contact us to develop an installation plan to descale the campus as part of the  University’s sustainability goals.
• Schools
• Return On Investment
W6 – Other College And University
W6 – Other College And University

Mineral Descaling Models:
Customized installation plan will be required

Installation Considerations:
If the University is interested in eliminating scale buildup in typical equipment (boilers, heat exchangers, cooling towers, pumps, etc) then sizing the appropriate model with be to match or exceed pipe diameter to descaler model  specifications. Contact us to develop an installation plan to descale the campus as part of the University’s sustainability goals.
• Schools
• Pool and Spa
• Irrigation



W7 – Theological Seminary
W7 – Theological Seminary

Mineral Descaling Models:
8" Main Water Pipe: S350
4" Main Hot Water Pipe: S50
2" Secondary Pipes: S10
(multiple locations)
2" Equipment Pipes: S10

Installation Considerations:
Contact us to develop a holistic installation plan to maximize energy efficiencies in mineral scale problem areas.
• Schools
• Pool and Spa
• Irrigation
W8 – Other Private School
W8 – Other Private School

Mineral Descaling Models:
8" Main Water Pipe: S350
4" Main Hot Water Pipe: S50
2" Secondary Pipes: S10
(multiple locations)
2" Equipment Pipes: S10

Installation Considerations:
Contact us to develop a holistic installation plan to maximize energy efficiencies in mineral scale problem areas.
• Schools
• Pool and Spa
• Irrigation
W9 – Miscellaneous Educational Facility
W9 – Miscellaneous Educational Facility

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Equipment Pipes: S10

Installation Considerations:
Remove mineral scale from vital building equipment before addressing a holistic plan to descale the entire building.
• Schools
• Pool and Spa
• Irrigation





Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
waslix logo purpose
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058
Email: Pierre@Waslix.com
Waslix © 2022 All Rights Reserved