Taikang Financial Tower
There are 4 heat exchanger systems in the building, which have to be treated. For the business purpose, the hot water supply can not be interrupted. 4 sets of Vulcan S10 were installed to gently clean the heat exchangers and the whole piping system without stopping the machines.
Model: Vulcan S10
Location: Beijing (China)
Installation Area: water inlet of the heat exchangers
About Taikang Financial Tower:
The construction was completed in 2007, located in the central area of Beijing. The total number of floors: 20 floors above ground and 3 floors underground.The black tanks are heat exchanger systems. The heat exchangers have been running for a long time, thus, the efficiency has been reduced because of limescale. Therefore, 3 sets of Vulcan S10 were installed at the water inlet of each heat exchanger.
Another Vulcan S10 was also installed at the water inlet of the heat exchanger. The advantage of Vulcan: no chemical, no need to stop hot water supply.