
Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.
Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.

L1 – Loft Over 8 Stories
(Mid Manhattan Type)
Mineral Descaling Models: |
Installation Considerations: Additional mineral descaling models may be required based on the core water based equipment and machinery used to support this building. |
• Office Buildings • Cooling Towers |

L2 – Loft Fireproof And Storage
(Without Stores)
Mineral Descaling Models: |
Installation Considerations: This installation is based on a higher occupancy rate than L1 Loft buildings. Instead of installing 1 significantly larger descaler model to descale the entire building smaller descaler can be positional on primary water pipes to support multiple levels. |
• Office Buildings • Cooling Towers |

L3 – Loft Semi-Fireproof
Mineral Descaling Models: |
Installation Considerations: This installation is based on a higher occupancy rate than L1 Loft buildings. Instead of installing 1 significantly larger descaler model to descale the entire building smaller descaler can be positional on primary water pipes to support multiple levels. |
• Office Buildings • Cooling Towers |

L8 – Loft With Retail Stores
(Other Than Type One)
Mineral Descaling Models: |
Installation Considerations: Lofts used as a residential dwelling will have a different installation plan that an office occupied space due to the higher water demands. |
• Office Buildings • Cooling Towers |

L9 – Miscellaneous Loft
Mineral Descaling Models: |
Installation Considerations: If part of the loft space I being used by a health club/ gym, a stronger descaler can be used on the primary hot water pipe. This will significantly help to keep showering and change room facilities cleaner with less effort. |
• Office Buildings • Cooling Towers |
Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.