NYC Accelerator logo white small

Mineral scaling has been proven to increase energy consumption, decrease equipment longevity and waste water in building support equipment

“NYC climate commitment is to reduce greenhouse gas emissions by 80% by 2050”

NYC Accelerator remove mineral scale save energe climate
 
NYC Accelerator badge small


NYC Building Classifications


Class O Buildings - Office Buildings




 

redevelopment

Please excuse our messy website!
We are developing a custom content management function to effectively communicate simple to high involvement products and solutions. Our new software should be ready to implement by April 30, 2024. Go exploring… 
Contact us at 412-848-5058 or info@waslix.com with any questions.


Energy Loss and Productivity caused by hard water scale



Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it.  |  412-848-5058) for a comprehensive installation plan for your building.


* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.

Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.


O1 – Office Only
O1 – Office Only
1 Story

Mineral Descaling Models:
6" Main Water Pipe: S150
4" Cooling Operations Pipe: S50
2" Secondary Level Pipes: S10

Installation Considerations:
This building type can be up to 9 stories high and the office environment covers 1 story. The primary descaling purpose would be to support building equipment. Additional descaler can be installed for each level.
• Office Buildings
• Cooling Towers
• Boliers
O2 – Office Only
O2 – Office Only
2 – 6 Stories

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Cooling Operations Pipes: S50
3" Secondary Water Pipe: S50

Installation Considerations:
The primary descaling purpose would be to support building equipment- typically grouped in a mechanical room. A stronger descaler would be installed on the primary water pip for the building as a centralized treatment location. Additional descaler can be installed on rooftop equipment.
• Office Buildings
• Cooling Towers
• Heat Exchangers
O3 – Office Only
O3 – Office Only
7 – 19 Stories

Mineral Descaling Models:
10" Main Water Pipe: S350
6" Booster Pump Pipes: S150
4" Secondary Level Pipe: S25
4" Cooling Tower: S50

Installation Considerations:
A standard installation plan is to always install a mineral descaler on the primary water pipe that supplies the building with water. This descales the water before it comes into company with any mechanical components, parts or filters. A primary concern will be to remove and prevent mineral scaling in building support equipment to lower energy costs, extend equipment lifespans and decrease general maintenance.
• Office Buildings
• Cooling Towers
• Heat Exchangers



O4 – Office Only With Or Without Comm
O4 – Office Only With Or Without Commerce
20 Stories Or More

Mineral Descaling Models:
10" Main Water Pipe: S350
8" Main Hot Water Pipe: S150
(1 descaler every 6 stories)
6" Cooling Operations: S150
4" Equipment Pipes: S50
4" Secondary Level Pipes: S50
(1 descaler every 3 stories)

Installation Considerations:
The best approach for a building of this use and size would be to support individual equipment. If there is an interest to descale the entire build as part of a holistic energy and sustainability plan to then incorporate multiple mineral descalers instead of relying on one or two very large descalers.
• Office Buildings
• Return On Investment
O5 – Office With Comm
O5 – Office With Commerce
1 To 6 Stories

Mineral Descaling Models:
8" Main Water Pipe: S150
4" Equipment Pipes: S50
4" Main Hot Water Pipe: S50
2" Cooling Operations: S10
2" Secondary Level Pipes: S10
(1 descaler every 3 stories)

Installation Considerations:
If the building ownership is interested in descaling the entire building it would be better to install multiple descalers. 1-3 larger descalers installed on primary water supply lines could also be used but installing smaller descalers in strategic locations will reenergize the water as it moves through the building (and equipment) creating even long and stronger descaling bonds.
• Office Buildings
• Cooling Towers
• Heat Exchangers
O6 – Office With Comm
O6 – Office With Commerce
7 – 19 Stories

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Pipes: S50
2½" Cooling Operations: S50

Installation Considerations:
This installation primary purpose is to support building equipment to lower energy consumption and the wasted water associated with cooling tower blow downs. A secondary descaling benefit will occur over time in general water pipe lines as water circulates from street to upper building levels.
• Office Buildings
• Cooling Towers
• Return On Investment



O7 – Professional Buildings
O7 – Professional Buildings
(Stand Alone Funeral Homes)

Mineral Descaling Models:
4" Main Water Pipe: S100
4" Main Hot Water Pipe: none
2" Building Equipment: S25
(cooling tower, heat exchanger, etc)

Installation Considerations:
Using a stronger mineral descaler on the main cold water pipe line will carry the benefit through hot water tanks/ boilers/ heat exchangers and into the hot water supply for restroom facilities.
• Office Buildings
• Heat Exchangers
O8 – Office With Apartments Only
O8 – Office With Apartments Only
(No Commerce)

Mineral Descaling Models:
6" Main Water Pipe: S150
2" Building Equipment: S10
(cooling tower, heat exchanger, etc)
¾" Tenant Units: V5000

Installation Considerations:
Installing smaller mineral descalers on the main water pipe entering tenant units will reenergize the water to offer a stronger descaling benefit in water heaters and general appliances. This will help to prevent shortened water heater lifespans caused by mineral scale damage that often results in water tanks bursting and leaking.
• Apartment Buildings
• Return On Investment
O9 – Miscellaneous And Old Style Bank Buildings
O9 – Miscellaneous And Old Style Bank Buildings

Mineral Descaling Models:
8" Main Water Pipe: S250
4" Equipment Pipes: S50
4" Main Hot Water Pipe: S100
2" Cooling Operations: S10
2" Secondary Level Pipes: S10
(1 descaler every 4-5 stories)

Installation Considerations:
This type of building can benefit greatly from a holistic mineral descaling plan to help prevent future corrosion and repetitive general maintenance involved with preplacing degraded equipment parts connected to mineral scaling corrosion.
• Office Buildings
• Return On Investment


Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.
waslix logo purpose
Our philosophy is to foster a strong association between how clearly clean water will have a healthy biological influence on our bodies and preventative repairs and maintenance to our homes and businesses.
Direct Contact:
Cell: 412-848-5058
Email: Pierre@Waslix.com