Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.
Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.
Z0 – Tennis Court, Pool, Shed
Mineral Descaling Models: |
Installation Considerations: Individual mineral descalers can be used to support pumps, water fountains and all other types of equipment involved in moving or holding water. Contact us to develop a customized plan for your community pools to keep your filter and pool cleaner for longer intervals and at a lower maintenance cost. |
• Pool and Spa • Community |
Z1 – Court House
Mineral Descaling Models: |
Installation Considerations: This example demonstrates how different sizes mineral descalers can be used on the same size water pipes depending how fast water is expected to be flowing through the pipeline and the final destination of the water usage. |
• Energy Efficiency Studies |
Z2 – Public Parking Area
Installation Considerations: Not applicable |
Z3 – Post Office
Mineral Descaling Models: |
Installation Considerations: The goal of this installation is to maximize the current and future descaling benefits for the property. |
• Office Buildings • Energy Efficiency Studies |
Z4 – Foreign Government
Mineral Descaling Models: |
Installation Considerations: The approach for this building type would be similar to a high-rise office building. Additional mineral descaler may be necessary on the upper half of the building’s primary water pipe/s. |
• Office Buildings • Energy Efficiency Studies • Return On Investment |
Z5 – United Nations
Mineral Descaling Models: |
Installation Considerations: Similar to a mid-size office use building. Adding stronger descalers or using more descaling units will be dependent on the overall size of the property and the ideal intended results. |
• Office Buildings • Energy Efficiency Studies |
Z6 – Land Under Water
Installation Considerations: Not applicable |
Z7 – Easement
Mineral Descaling Models: |
Installation Considerations: NYC City Planning can install mineral descalers to support underground water pipes to prevent current and future pipe corrosion to prevent leaking and pipe bursts. An appropriately sized mineral descaler can support up to 1 mile of linear pipe length. |
• Underground Installation |
Z8 – Cemetery
Installation Considerations: Not applicable, unless there is a need to support a structure or water fountains. In most situations, a V5000 model will be sufficient. |
Z9 – Other Miscellaneous
Mineral Descaling Models: |
Installation Considerations: Contact us to help you develop a customized installation plan for your building and your ultimate goal. |
Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.