Contact Waslix (This email address is being protected from spambots. You need JavaScript enabled to view it. | 412-848-5058) for a comprehensive installation plan for your building.
* Sizing an appropriate mineral descaler model/s is a combination of the building’s primary use, diameter of the water pipes where the mineral descaler will be installed, and the anticipated water flow. Other variables such as building height, square footage and supporting equipment (boilers, heat exchanges, cooling tower, etc.) also play a role in developing a holistic descaling plan to lower energy consumption and extend equipment and piping infrastructure lifespans.
Note: to offer a general mineral descaling model sizing plan for the building classifications below, assumptions were made for pipe diameter, number of floors, building size, etc. A final installation plan for your specific building may require more or fewer installed models.
E1 - Fireproof Warehouse
Mineral Descaling Models: |
Installation Considerations: The anticipated water demands for a warehouse is expected to be low. If your building is using a higher water demand as part of your industrial process an additional descaler can be used to support your process or a larger descaler can be installed on your primary water line. |
• Energy Efficiency Studies |
E3 - Semi-Fireproof Warehouse
Mineral Descaling Models: |
Installation Considerations: The anticipated water demands for a warehouse is expected to be low. If your building is using a higher water demand as part of your industrial process an additional descaler can be used to support your process or a larger descaler can be installed on your primary water line. |
• Energy Efficiency Studies |
E4 - Metal Frame Warehouse
Mineral Descaling Models: |
Installation Considerations: The anticipated water demands for a warehouse is expected to be low. If your building is using a higher water demand as part of your industrial process an additional descaler can be used to support your process or a larger descaler can be installed on your primary water line. |
• Energy Efficiency Studies |
E7 - Self Storage Warehouse
Mineral Descaling Models: |
Installation Considerations: The water demands of a self-storage warehouse would be limited to administrative offices and if a water based cooling system is used to support the facility. |
• Energy Efficiency Studies |
E9 - Miscellaneous Warehouse
Mineral Descaling Models: |
Installation Considerations: The anticipated water demands for a warehouse is expected to be low. If your building is using a higher water demand as part of your industrial process an additional descaler can be used to support your process or a larger descaler can be installed on your primary water line. |
• Energy Efficiency Studies |
Without knowing the intrinsic specifications for your property classification, the examples above are offered as a possible solution. However, this may not be completely accurate until the above-mentioned variables are considered.